Synced
GenerationCoordinator.Wait
Section titled “GenerationCoordinator.Wait”
- Waits for all retirements while preserving pending monitors on cancellation or failure.
Required contracts
Section titled “Required contracts”API: engine
Project: Inno.Extensibility.Reload
Declaration
Section titled “Declaration”public void Inno.Extensibility.Reload.GenerationCoordinator.Wait(System.Threading.CancellationToken cancellationToken = default(System.Threading.CancellationToken))Parameters
Section titled “Parameters”Parameter cancellationToken: Cancellation for the wait, not permission to resume generation changes.
Exceptions
Section titled “Exceptions”Exception T:System.OperationCanceledException: The caller canceled before retirement completed.